Drone Filming an Award-Winning Marine Project: ABP Solent Gateway's Falklands Jetty Upgrade

    Associated British Ports
    •
    Maritime, Civil Engineering and Defence Infrastructure

    Film and photo of ABP Solent Gateway's Phase 2 jetty upgrade at Marchwood - captured for the award submission that won at the ICE South East Awards.

    ICE Award-winning project · Restricted MOD site
    Solent Sky Services was commissioned by Associated British Ports to capture film and photography of the Phase 2 marine infrastructure upgrade at ABP Solent Gateway's Falklands Jetty in Marchwood - the content underpinning the project's award submission to the Institution of Civil Engineers. The submission went on to win at the ICE South East Awards. The Falklands Jetty at ABP Solent Gateway, on Southampton Water, is a piece of marine infrastructure with national significance. Marchwood is a designated Strategic Military Port supporting the UK Ministry of Defence, and the jetty also serves a growing range of commercial operations. ABP's £17.5 million Phase 2 marine infrastructure project future-proofed the 40-year-old jetty for at least another 40 years - and was put forward for recognition at the Institution of Civil Engineers Awards. Our work on the project involved: - Film and photo coverage of the Phase 2 marine infrastructure works at Falklands Jetty - Capturing the scale and complexity of the engineering for an industry-expert audience - Producing content tailored for use in the ICE Awards submission - Working within a restricted, security-sensitive port environment This was a noticeably different kind of brief to our cruise work. Awards submissions are judged by engineers, not by general audiences - the imagery has to communicate the scale, the technical achievement and the quality of execution clearly and credibly. That informed our approach throughout, from the angles we flew to the level of detail we captured. Working at Marchwood also brought a higher bar on access and security. As a designated Strategic Military Port, it's not a site that can be filmed casually - and our established relationship with ABP, our CAA permissions and our safety record gave the client confidence we could operate appropriately within that environment. The project went on to win the Best Project - Asset Maintenance Award at the ICE South East Awards, recognising ABP and its partners Boskalis Westminster, Knights Brown and Ramboll.
    drone photo of maritime engineering project in solent gateway
    View
    drone photo of maritime engineering project in solent gateway
    View
    drone photo of maritime engineering project in solent gateway
    View
    drone photo of maritime engineering team project in solent gateway
    View
    drone photo of maritime engineering project in solent gateway - cemex
    View
    drone photo of maritime engineering project in solent gateway - gloves silver
    View
    behind the scenes drone photo of maritime engineering project in solent gateway
    View
    dii inspire 3 maritime engineering project
    View
    drone photo of maritime engineering project in solent gateway
    View
    drone photo of maritime engineering project in solent gateway
    View
    drone photo of maritime engineering project in solent gateway
    View
    PRE

    Pre-Production

    Briefed directly by ABP to capture film and photography of the Phase 2 marine infrastructure works at Falklands Jetty, ABP Solent Gateway, for use in the project's ICE Awards submission. Coordinated access and security clearance for a designated Strategic Military Port environment, agreed the engineering-led narrative the imagery needed to support, and completed airspace planning, risk assessments and method statements (RAMS) for aerial and ground operations on a restricted site.

    SHOOT

    Production

    Captured film and photo coverage of the Phase 2 works at Falklands Jetty, prioritising angles and detail that communicate the scale, complexity and quality of execution of the marine infrastructure project to an engineering audience. Operated within the access and security requirements of a Strategic Military Port throughout.

    POST

    Post-Production

    Selected, edited and finished the film and photography to a standard suited to an ICE Awards submission, delivering content that helped support the project's recognition with the Best Project - Asset Maintenance Award at the ICE South East Awards, won by ABP with project partners Boskalis Westminster, Knights Brown and Ramboll.

    Marchwood is a designated Strategic Military Port, and ABP is known for the calibre of locations its sites provide - a point underlined when we later discovered that Amazon MGM Studios’ Project Hail Mary, starring Ryan Gosling and Sandra Hüller, had been shot at the same port.

    The production built a huge hangar set on site, along with actor trailers and costume workshops supporting a crew of more than 500. Marchwood’s natural tree cover and established security gave the production a private, contained base for its high-profile cast. The port and vessels berthed there, including the ro-ro ferry MV Commodore Goodwill, stood in for a laboratory and nerve centre floating in the Pacific Ocean, used for flashback sequences featuring the carrier scientists and the spin drive demonstrations.

    It’s a good illustration of why ABP sites work so well for filming. Large, secure, working port environments with deep-water berths, extensive hardstanding and controlled access give productions the space to build and operate at scale, well away from public view - qualities we see first-hand every time we fly at ABP locations.

    Equipment Used

    Zenmuse X9-8K AirFUJI X-T4Blackmagic Cinema Camera 6KDJI Inspire 3RED Komodo 6KDJI Mini 4 Pro

    Ready for take-off?

    Whether you need aerial footage, drone surveys, or creative consultation, let's talk.

    24-hour response
    No obligation quote